Rooftops End-of-Line

| What?

Microplan RT-EOL end of line test rigs are suitable for rooftop units.

| How?

RT-EOL test rigs are intended to perform full functional tests.

| Where?

At the end of the production line, before the packaging.

| Who?

Manufacturers of rooftops.

| Why?

  • Final test time reduction
  • Elimination of false failure
  • Quality improvement
  • Full traceability of test data
  • Human operations driven and controlled by the test rig
  • Test data available for statistical elaborations
  • Multilanguage software

| Tests

  • Operator identification through scanner or badge
  • Rooftop identification trough barcode reading and test sequence automatic loading and running
  • Electric safety tests:
    • Dielectric rigidity
    • Ground continuity
    • Insulation
  • Gas soundness test
  • First heat demand check, gas inlet pressure measurement
  • Gas leak detection (learn more)
  • Second heat demand check, gas inlet pressure measurement
  • Gas leak detection
  • Burner on check: gas flow measurement
  • Ionization current measurement
  • Gas inlet pressure measurement
  • Modules switch off and minimum adjusting check
  • Rollout and pressure switch intervention check
  • Outlet temperature measurement
  • Faults conditions simulation and check of lockout state
  • Test status interface with production line
  • Test data saving
  • Final report label printing
Gallery: