Gas assemblies

Gas Assemblies R&D

|What?  

R&D test benches are suitable for:

  • gas valves
  • gas assemblies

|How?

R&D test benches are designed to give the operator the maximum flexibility to perform all the tests needed to evaluate the performance of boilers' components.

|Where?

In R&D laboratories.

|Who?

  • Manufacturers of gas boilers. 
  • Manufacturers of gas valves and gas assemblies.

|Why?

  • Product certification costs reduction 
  • Benchmarking 
  • Time to market reduction
  • Preparation for product certification
  • Quality improvement
  • Research and development of new products
  • Full automatic control of flow and temperature regulations
  • Full traceability of test data
  • Test data and report available for statistical elaborations
  • Market credibility

|Tests

  • Full flexible tests. The synoptic panel is available for the operator to:
    • activate any component
    • log any measurement
    • graph any measure 
  • Automatic regulations. The operator can set the parameters to perform:
    • automatic PID regulations of water flow and temperature
    • automatic increasing or decreasing ramps
    • PWM control of fan
  • Test sequence editor:
    • the operator can perfom a series of operations and save them as a test sequence
    • every sequence created can be recalled for future use

|Software

Gallery: 

Gas Valves and Gas Assemblies End-of-Line

early test of components  

| What?

Microplan's early test rigs GA-EOL are suitable for:

  • gas valves
  • gas assemblies (gas valve + burner + inlet pipe)

|How?

Microplan's early test rigs GA-EOL are designed to perform full functional tests and gas valve pre-adjustment.

|Where?

In the production line before the final assembly.

|Who?

  • Manufactures of gas fired boilers (only conventional)
  • Manufacturers of gas valves

|Which?

GA-EOL test rigs are suitable for gas valves of the different manufacturers available on the market. 

|Why?

  • Reduction of final test time
  • Reduced faults at final tests
  • Takt time balance [read more in our blog]
  • Quality improvement
  • Full traceability of test data
  • Human operations driven and controlled by the test rig
  • Test data available for statistical elaborations
  • Market credibility

|Tests

  • Operator identification through scanner or badge
  • Assembly identification through barcode reading and test sequence automatic loading and running
  • Automatic pre-adjustment of gas valve (min and max) through automatic screwdrivers
  • Gas pressure measurement
  • Gas flow measurement
  • Complete test of gas assembly: multistage leakage test and adjustment
  • Inlet pressure automatic control
Gallery: 
Subscribe to RSS - Gas assemblies