• Gas valves pre-adjustment 1
  • Gas valves pre-adjustment 2
  • Gas valves pre-adjustment 3
  • Gas valves pre-adjustment 4
  • Gas valves pre-adjustment 5

Gas valves pre-adjustment

Pre-adjusting gas valves

Extensive functional tests are critical to assure top quality products. Microplan’s EOL test benches will: - Discover all quality issues prior to product shipment, ensuring customer satisfaction - Automatically execute pre-configured End-of-Line tests with minimal operator input, skill or training - Store all test data by boiler barcode for maximum traceability and data analytics - Display explanation of each step of the test and provide instructions with illustrations or video if necessary. Because time is critical, Microplan has developed parallel execution software for maximum efficiency.

The bench allows the pre-adjustment  of the valves (and systems) by using air and measuring flow rates and pressure quantities.

Features:


  • Automatic tests
  • Test data on high quality display screen
  • All test data saved to database
  • Parallel testing sequences
  • Customized operator messages in preferred language
  • Help files, illustration and/or video
  • Traceability by unit serial number



Installation requirements:


  • Gas supply
  • Compressed air
  • Electricity


Gas valves pre-adjustment test machines come with two main configurations:

  • manual
  • semi-automatic

Both of them are customisable to customer's specifications.



Gas valves pre-adjustment test machines come with two main configurations:

  • manual
  • semi-automatic

Both of them are customisable to customer's specifications.



The bench allows the pre-adjustment  of the valves (and systems) by using air and measuring flow rates and pressure quantities.

Features:


  • Automatic tests
  • Test data on high quality display screen
  • All test data saved to database
  • Parallel testing sequences
  • Customized operator messages in preferred language
  • Help files, illustration and/or video
  • Traceability by unit serial number



Installation requirements:


  • Gas supply
  • Compressed air
  • Electricity


Contact Us

Contact us for more informations about this product. We’ll answer you as soon as possibile!



Microplan test benches installed in the world

Every day Microplan tests systems are switched on in

150 plants of

 30 different countries